MIL-DTL-29181C
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of the specification.
b. Style (see 1.2).
c. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.2.1 and 2.3).
d. When first article sample and inspection is required (see 3.1 and 4.2).
e. When bolt holes are not required (see 3.2.1).
f. Material required (see 3.3.1).
g. Size of identification markings, if other than as specified (see 3.6).
h. Packaging requirements (see 5.1).
6.2.1 Part identification number (PIN). A PIN has been established to facilitate procurement of a
mixture of components by a self-constructed part ordering number (see 1.2).
M29181 - XX
Style (see 1.2).
Military specification designator.
6.3 First article. When a first article inspection is required, the item will be tested and should be a
first article sample or it may be a standard production item from the contractor's current inventory
as specified in 4.2. The first article should consist of six hasps. The contracting officer should
include specific instructions in acquisition documents regarding arrangements for examination,
test, and approval of the first article.
6.4 Sampling for tests. Recommended inspection level is S-2 (see 4.4.1).
6.5 Subject term (key word) listing.
NAPEC hasp
6.6 Changes from previous issue. Marginal notations are not used in this revision to identify
changes with respect to the previous issue due to the extent of the changes.
Custodians:
Preparing Activity:
Army - GL4
Navy - YD1
Navy - YD1
Air Force - 99
(Project 5340-2382)
Review Activities:
Navy - AS, CG, NO
Air Force - 82
DLA - IS
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business