A-A-55594B
6.6 Ordering data. The contract or order should specify the following:
a.
CID document number, revision, and CID PIN.
b.
Product conformance provisions.
c.
Packaging requirements.
6.7 Key words.
Cadmium
Knuckle
Pitch
6.8 Changes from previous issue. The margins of this specification are marked with vertical lines to indicate where
changes (additions, modifications, corrections, deletions) from the previous issue were made. This was done as a
convenience only, and the government assumes no liability whatsoever for any inaccuracies in these notations.
Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content
irrespective of the marginal notations and relationship to the last previous issue.
MILITARY ACTIVITIES:
CIVIL AGENCY COORDINATING ACTIVITY:
GSA FAS
Custodian:
Army AR
Preparing activity:
Navy AS
DLA IS
Air Force 99
Review activities:
(Project 5340-2010-026)
Army MI
Navy MC
Air Force 71
NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and
responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at
https://assist.daps.dla.mil.
4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business